| DATE | TRAIL NAME | VEHICLE USED | NOTES |
| 2008-03-22 | Old Walhalla / Coach Rd | Jeep Patriot | The track was very easy. Quite suitable for 2WD or AWDs, all the way to the River crossing at Brunton Bridge. The water was a max of 50cm and flowing moderately swiftly. There are 2 crossings available at the railway bridge. The Right hand entrance moves down into the river and along for about 30 meters before exiting on the far side, this is fairly easy and the shallower of the two. The second crossing is straight across. It is deeper and the more difficult of the two. Today it was about the limit of the Patriots fording capability. It started running out of momentum on the crossing and required a little persuasion to keep on. I wouldn't want to go much deeper. :) |
| 2008-02-14 | Bunyip Ridge Track | Jeep Patriot | The track was fairly dry and would be difficult if it was wet. If the main climb had been wet, we would not have made it in our stock Patriot. The ruts made it quite difficult to get up and we really felt the lack of clearance in the Patiot on the hill, apart from that, it is a great track. |
| 2008-01-7 | Nash Creek Loop Track | Jeep Patriot | |
| 2007-12-29 | Nightcap National Park | Jeep Patriot |
Loading map... please wait